Ontario Court Finds Coverage for Business Interruption Under an "All-risk" Policy; Gives Hope to Policyholders with COVID-19 Loss-of-Use Claims


On March 30, 2020, the Ontario Superior Court of Justice released its opinion in the MDS, Inc. et al v. Factory Mutual Insurance Company1 case. While the case is favorable to policyholders with business interruption claims under “all risk” policies, attorneys representing policyholders are particularly excited as Justice Wilson’s adoption of broad interpretation of “resulting physical damage” may be very useful in pursuing coverage for business interruption losses related to COVID-19 exposures.

This case arises out of a heavy water leak at the Nuclear Research Universal Reactor at Chalk River, Ontario (“NRU”). Atomic Energy of Canada Limited (“AECL”) produces radioisotopes at the NRU. In 2009, an unanticipated leak of heavy water containing radioactive Tritium was discovered coming through the calandria wall of the NRU. AECL notified the Canadian Nuclear Safety Commission (“CNSC”) who ordered a shutdown of the NRU. Although expected to last 36 hours, the shutdown lasted 15 months. Once it was determined that the leak went through the calandria wall and was not easily repairable, the NRU could not return to service until CNSC’s requirements were satisfied.

The plaintiffs, MDS Inc. and MDS CANADA Inc. (“MDS”) purchase radioactive isotopes from NRU and sell them worldwide. At the time of the leak, MDS had an “all risk” policy with Factory Mutual Insurance Company (“FM Global”) which insured MDS against “all risks of physical loss or damage except as excluded.”2 The policy contained Contingent Time Element coverage with limits of US $25 million, which insured MDS for lost profits due to interruption in supply “directly resulting from physical loss or damage of the type insured by this Policy.”3

As a result of the NRU shutdown, MDS was unable to purchase isotopes from AECL and lost over CA $121 million in profits because it could not procure replacement isotopes elsewhere. MDS submitted a claim for loss of profits under the Contingent Time Element coverage. FM Global denied, relying predominately on the corrosion exclusion.4 The evidence showed that there were two types of corrosion at the NRU: 1) gradual, generalized corrosion which reduced the thickness of the outer walls of the calandria and the reflector between 1974 and 2009, which was deemed not risky to operation of the reactor; and 2) unanticipated corrosion which caused the leak by penetrating the 8 mm thick calandria wall. MDS’s expert opined, and the Court accepted, that aggressive contaminant or agent such as chlorine caused this second type of corrosion.

Corrosion was not defined in the policy. FM Global maintained that the leak was caused by the first type of corrosion, which was excluded under the corrosion exclusion. However, in testimony before the court, FM Global’s representatives conceded that not all corrosion would be barred under the corrosion exclusion.

In its extensive analysis, the Court stressed that all-risk policies are “generally understood to protect against fortuitous losses, unless such losses are otherwise excluded.”5 It then concluded that the “pitting” corrosion of the second type caused the leak, and as it was unexpected, it was exactly the type of fortuitous loss against which the all-risk policy was meant to protect. Therefore, the corrosion exclusion did not bar coverage.

A key issue in the case was whether resulting physical damage should be defined narrowly to require actual physical damage (as FM Global argued), or broadly so as to include loss of use (as MDS argued). The Court relied on the principle that where an insurance policy is clear and unambiguous on its face, it is unnecessary to resort to external evidence to interpret its terms. However, the terms of a seemingly clear insurance policy must be examined in light of the surrounding circumstances, sometimes called the “factual matrix,” in order to determine the intent of the parties and the scope of their understanding.6 The Court then outlined the “factual matrix” of this case: the NRU shutdown ordered by the CNSC; the nature of the investigation of the leak and the extensive and time-consuming measures taken to investigate and repair the leak; the risk to the public because of a possibility of a nuclear meltdown; and the impossibility for NRU to resume operations (and for MDS to purchase its isotopes) until the leak was repaired.7

The Court concluded that a broad definition of “resulting physical damage” was

appropriate in the factual context of this case to interpret the words in the Policy to include impairment of function or use of tangible property caused by the unexpected leak of heavy water. This interpretation is in accordance with the purpose of all-risk property insurance, which is to provide broad coverage. To interpret physical damage as suggested by the Insurer would deprive the Insured of a significant aspect of the coverage for which they contracted, leading to an unfair result contrary to the commercial purpose of broad all-risk coverage.8

The Court held that MDS was entitled to the full US $25 million limit, under the Contingent Time Element coverage, for its lost profits resulting from the unavailability of isotope supply during the NRU shutdown.

This opinion is important for two reasons: First, it adopts the broad interpretation of “resulting property damage” under all-risk policies, which is helpful to insureds seeking coverage for business interruption and lost profits. Second (and perhaps more importantly at this time), it provides policyholder counsel with a roadmap to argue that business interruption losses related to shutdowns because of COVID-19 can, under the right set of facts, be covered by an “all-risk” policy.

For more details about this case alert, or about SDV’s international practice group, contact coverage@sdvlaw.com
_________________________________________________________________________________________________________
1MDS Inc. v. Factory Mutual Insurance Company (FM Global), 2020 ONSC 1924.
2Opinion at par. 2.
3Opinion at par. 182.
4It also argued that the radiation exclusion and the idle period exclusion applied.
5Opinion at par. 166 (quoting British & Foreign Marine Insurance Co. v Gaunt, [1921] A.C. 41 (U.K. H.L.)).
6Opinion at par. 170 (quoting Dunn v. Chubb Insurance Co. of Canada, 2009 ONCA 538 at par. 33).
7The court also found the relationship between FM Global and MDS significant: FM Global has insured MDS from 1993 to 2009; FM Global knew that the supply of isotopes from AECL at the NRU was a major component of MDS’s worldwide activities and that, before the shutdown, the revenues from the supply of isotopes from AECL constituted 45% of the world income of MDS. FM Global also knew that MDS wanted to increase the Contingent Time Element coverage to $80MIL to protect against loss of isotope supply, and these discussions were going on for a year before the shutdown. From internal carrier communications right after the loss, it was clear that FM Global understood that “accidental” corrosion would be covered under the Policy. Finally, FM Global denied coverage in August 2009, before the cause of the leak could be determined.
8Opinion at par. 518-519
.

 

Click on this link to view the article in pdf format






CONTACT US


The email you are sending does not create an attorney-client relationship with SDV. We do not agree to representation until we have performed a check for conflicts of interest and expressly agree to provide services in a particular matter via an engagement letter. The information submitted to us via this website will NOT be treated as confidential or privileged as a lawyer/client communication and our receipt of this information does not prevent us from representing a client related to the subject of your inquiry.

Northeast

35 Nutmeg Drive
Trumbull, CT 06611

203.287.2100

233 Mount Airy Road
Basking Ridge, NJ 07920

973.446.7300

Southeast

999 Vanderbilt Beach Road, Ste 603
Naples, FL 34108

239.316.7244

West Coast

One BetterWorld Circle
Temecula, CA 92590

951.365.3145

SDV is headquartered in Connecticut, with regional offices in New Jersey, Florida, and California to better serve our clients. We are ready to answer your questions and are eager to assist you in developing solutions.